ISCC EU RCF certification: what must a collecting point send downstream?
Prepare an ISCC EU RCF handover with generation-region evidence, dry-tonne data and current declarations. See a worked collecting-point and processor checklist.

Planning ISCC EU certification for an RCF collecting point? Prepare a traceable handover from the material’s generation region to the downstream processor: the supported ex-use and diversion assessment, its dry-tonne reporting basis, and the consignment records carrying that information. A generic supplier declaration or a waste description alone does not settle those questions.
Mason Ali is BM Certification’s ISCC representative for Australia and New Zealand. Get-ISO handles enquiries and coordinates the certification pathway. BM Certification makes certification decisions and issues certificates where appointed as the certification body.
The 25 November RCF clarification: who does what?
ISCC’s 25 November 2026 EU update assigns collecting points and individually certified points of origin at the start of an RCF chain responsibility for determining ex-use and diversion using the prevailing treatment in the region where the material is generated. That information goes downstream in kgCO2eq per dry tonne of certified raw material.
The notice announces an RCF sustainability-declaration template and updated proofs of sustainability, self-declarations and audit procedures in the client section. The reporting basis is kgCO2eq per dry tonne for raw materials/intermediates at origin and collection scopes. Processing-unit reporting distinguishes fuel outputs, in gCO2eq/MJ, from intermediates, in kgCO2eq per dry tonne.
The clarification was issued on 25 November 2026; its RCF entry gives no separate future application date. Review affected evidence and current documents rather than applying the January 2027 date from the separate PLUS audit-risk update. This article addresses ISCC EU RCF supply chains. It does not establish PLUS or CORSIA criteria or make every waste feedstock eligible.
Start the certification conversation with the actual activity
Describe where the material arises, who first gathers it, where it is stored and which entity processes it. Identify the intended output and market separately from the scheme. The proposed RCF pathway and material need assessment under the applicable criteria before a scope or claim can be confirmed.
For a collecting point receiving material from suppliers, the certification coordinator should map which evidence comes from each supplier and which assessment the collecting point itself must complete. An individually certified point of origin has its own origin-stage responsibilities. A downstream processor needs to understand the incoming assessment without silently replacing it with assumptions about its own location.
These are useful questions for initial certification or a recertification quotation: which entity owns the regional assessment, which records support it, and how does the processor receive the approved information? Changing certification bodies does not remove an unresolved evidence gap.
A practical handover checklist with named owners
The following is an original Get-ISO preparation checklist, not an official ISCC template. Use the applicable current scheme documents to determine precise requirements and agree secure access for detailed records.
| Handover question | Implementation owner and retained records | Audit sample and reconciliation |
|---|---|---|
| Where was this material generated? | Supplier and procurement: generation-site and region references linked to the material and receipt. | Trace a received lot to its generating source; distinguish that region from dispatch and processing locations. |
| What supports the ex-use/diversion assessment? | Origin/collection GHG lead: applicable method, relevant regional-treatment evidence, material coverage, assumptions and approval. | Compare the assessment with the source evidence’s geographic, material and time coverage. |
| What quantity does the information describe? | Stock controller: receipt and movement identifiers, dry-mass calculation basis, measurement links and characteristic records. | Reconcile the selected quantity and unit basis from intake through dispatch and remaining stock. |
| What was passed to the customer? | Declaration preparer and reviewer: applicable current form, approved figures and units, lot links, revision and issue trail. | Compare an issued record with the approved calculation and its source consignment. |
| How is it used by the processor? | Processor’s GHG lead: incoming-data review, calculation boundary, processing inputs and output-specific reporting basis. | Follow the incoming information into the processor’s calculation; do not confuse a raw-material figure with a fuel result. |
Worked example: two regions, one processor, an incomplete handover
A fictional collecting point supplies a processor from two generating regions. Region A’s file has a documented technical assessment with the regional-treatment sources and applicability review. Region B’s file contains a supplier statement about one facility’s treatment route, but no supported determination of what treatment prevails for the relevant material in its generation region.
The stock records show 24 dry tonnes from A and 16 dry tonnes from B. The proposed dispatch comprises 12 dry tonnes from A and 8 from B, with no opening stock, losses or other movements in this simplified example. The sales team proposes giving both portions A’s approved information because they have the same internal material name and go to the same processor.
The worked response: the collecting point’s GHG lead does not extend A’s assessment to B without evidence that supports B’s situation. Procurement obtains the missing regional information; the reviewer keeps B’s unsupported RCF data or claim from release. The hold concerns the unsupported information and proposed certified claim, not an instruction that all physical trade must stop.
The coordinator keeps the two evidence references distinguishable in the proposed handover. The controller can reconcile 24 − 12 = 12 dry tonnes remaining for A and 16 − 8 = 8 for B. The overall balance is 40 received, 20 proposed for dispatch and 20 remaining. That correct total still does not establish B’s regional assessment.
This is an evidence-management example, not permission to pool particular materials or characteristics. Actual bookkeeping and any combination of consignments must follow the applicable scheme rules. No emission factor, feedstock approval or certification result is invented here.
What the receiving processor should check
The processor’s receiving reviewer compares the proposed incoming declaration with the material and consignment references. Where information is missing or inconsistent, the reviewer records the query, owner and resolution rather than copying an unsupported value into the calculation system.
The processor’s GHG lead then checks what the number represents: the relevant incoming component, units and quantity basis, and the method needed to incorporate it into the actual process calculation. A dry-tonne figure cannot become a finished-fuel result simply by changing its label to gCO2eq/MJ. Output energy, process emissions and other applicable method inputs need their own substantiation.
For intermediate outputs, retain the applicable dry-tonne reporting basis and calculation trail. For fuel outputs, retain the applicable energy-based result and supporting calculation. The public bulletin establishes the reporting distinction; it does not provide every equation needed to calculate a particular plant’s result.
Replace superseded forms through a controlled document review
The certification coordinator should retrieve the relevant current RCF documents through authorised ISCC client access, identify affected procedures and make the released versions available to the people who prepare and review transactions. Record which version was reviewed and what changed in the site’s working process.
Use the updated sustainability declaration for the relevant raw-material/intermediate handover and the applicable self-declaration, proof of sustainability and audit procedures for their respective functions. Check applicability rather than treating those different records as interchangeable. Retain historical issued records and their correction trail; do not silently rewrite past documents.
The private forms were not reproduced or reviewed field by field for this article. The checklist above is independently written. The responsible scheme user should confirm the precise current fields and instructions in the controlled documents before issuing a record.
What an auditor can sample and reconcile
An auditor can begin with a processor’s incoming transaction and trace backwards to the collecting point’s issued information, approved assessment and generating-region evidence. A reverse sample starts at an origin and follows its quantities and characteristics into receipts, movements and outgoing records.
For the illustrative Region B exception, sample the query and release decision. Was missing evidence obtained and technically reviewed, or was only a spreadsheet field populated? For both regions, reconcile dry quantities and the associated supporting measurement records. Check an amended record against the prior issue and the customer communication where relevant.
The coordinator can test effectiveness before the audit by asking someone outside the original preparation to retrieve that complete trail for one normal transaction and one exception. Retain the result and correct any broken link. Our PDCA exercise for regional evidence and dry-tonne calculations addresses the separate moisture and denominator controls.
Discuss initial certification, recertification or a change of body
The official ISCC directory lists BM Certification SIA for ISCC EU, PLUS, CORSIA and CORSIA PLUS. Confirm the proposed RCF activities, location, technical scope and engagement with the appointed certification body; the directory listing does not guarantee acceptance of a particular supply chain.
Contact Get-ISO through the ISCC certification service or ISCC initial certification, recertification or change-of-body enquiry form. Include feedstock, generation regions, sites, activities, intended fuel/product and market, current scheme/body, certificate expiry and target audit date as applicable.
For this RCF question, add who currently determines ex-use/diversion, how dry quantities are established, the downstream processor’s role and any open evidence questions. If changing bodies at recertification, identify relevant prior findings and their closure records. Get-ISO coordinates the enquiry; certification decisions and certificate issuance remain with BM Certification where appointed.
Official sources checked on 29 November 2026
- ISCC’s original 25 November 2026 bulletin, section 1.5, checked against the RCF clarification in the public System Updates register.
- ISCC document library, including its stated access restrictions for declarations and audit procedures. No private template or assessment material is reproduced.
- ISCC cooperating certification-body directory and BM Certification’s Australian contact listing for listed schemes and Mason’s regional appointment.
The regions, quantities and workflow are illustrative Get-ISO examples. They do not replace the applicable scheme criteria, establish an eligible feedstock or promise an audit outcome.
General guidance. Use the applicable standard, scheme documents and agreed engagement criteria. Examples are illustrative and do not establish a certification outcome.