ISCC EU · UCO staff competence
ISCC EU certification for UCO traders: who covers declaration review?
Prepare competent cover for UCO sustainability-declaration review before an ISCC EU audit. Use a practical handover checklist, authority limits and a worked example.

A UCO trader preparing for ISCC EU certification should be able to explain who reviews sustainability declarations when the usual contact is absent. Give that work to a competent, authorised person with access to the supporting records. If suitable cover is unavailable, define how the affected claim is held and escalated. Copying yesterday’s declaration is not a handover.
Mason Ali is BM Certification’s ISCC representative for Australia and New Zealand. Get-ISO handles enquiries and coordinates the certification pathway. The official ISCC directory lists BM Certification SIA, identifier LT227, for ISCC EU and ISCC CORSIA, among its cooperating schemes. BM Certification makes certification decisions and issues certificates where it is the appointed certification body.
Required competence versus a recommended backup
ISCC EU 203 v4.2, sections 3.2.1–3.2.3 requires management to nominate competent staff at critical control points, document responsibilities and authorities, implement an appropriate training plan and retain training records. Its provisions cover quantity bookkeeping and issuing sustainability declarations as well as other chain-of-custody tasks.
The backup arrangement below is Get-ISO’s practical recommendation for continuity. It does not establish a universal two-person approval rule or a separate deputy qualification. Define the arrangement according to your activities, risk and actual staffing; ask the appointed body about criteria applicable to your scope.
A practical handover checklist before the audit
- Assign the decision, not just the inbox. The manager records who prepares declarations, who may approve their release and who receives unresolved questions. State the deputy’s limits: for example, routine transactions only, with unfamiliar GHG data referred to the designated specialist.
- Make the evidence accessible. Give the deputy their own appropriate access to the controlled procedure, current transaction records and relevant stock information. Test access before leave begins. Avoid a handover that depends on another person’s password or private mailbox.
- Walk through a complete file. Ask the deputy to explain where a proposed claim comes from and how it connects to the physical transaction. Use the applicable scheme procedure; do not let an old customer document become the authority for a new claim.
- Practise a stop decision. Include an exercise where an essential record cannot be located. The deputy should identify what remains unresolved, hold the affected claim under the company’s procedure and use the escalation route. A dispatch deadline should not substitute for evidence.
- Retain an observed competence check. Record the task demonstrated, records used, questions asked, outcome, assessor and any further training. Review the first live case handled during cover and close identified gaps. Attendance at a briefing alone gives little evidence of independent performance.
Worked example — the usual reviewer is away
This is an original illustrative training example, not a client event or an ISCC template. A trader with storage plans an 8-tonne UCO dispatch while its regular sustainability coordinator is on leave. The sales file contains a draft declaration from a previous transaction, but the incoming evidence needed for the proposed allocation is not linked in the current dispatch file.
The deputy does not assume the earlier declaration can be reused. They mark the proposed claim as awaiting evidence, record the missing link against the dispatch reference and notify the manager through the agreed route. The manager arranges a traceability review by a person authorised for that task. The customer receives a factual update about the documentation status without an unsupported certification assurance.
For the rehearsal, retain the sample inputs, the expected hold decision and the deputy’s actual response. Keep training transactions outside the live ledger. For a real case, retain the authorised resolution and the evidence supporting it. Where an actual documentation, reporting or material-flow discrepancy is identified, ISCC EU 203 section 3.2.2 requires immediate notification to the certification body; the handover must not conceal that obligation.
How to check whether the cover works
The manager selects a later transaction handled without the regular coordinator’s help. Can another reviewer reconstruct the decision from the retained file? Did the deputy stay within their authority, escalate uncertainty and use the current procedure? Record what failed and retest the affected task after improvement. Do not report an exercise as a successful live transaction or a certification result.
Keep fuel pathway, market and scheme separate
A trader may supply UCO toward FAME biodiesel, HVO renewable diesel or HEFA sustainable aviation fuel. Identify the buyer’s intended market and required scheme before applying this checklist. This article addresses ISCC EU staff handover. It does not establish UCO eligibility for every pathway. Where a HEFA chain supports a CORSIA claim, review the separate ISCC CORSIA criteria and train cover for that scheme rather than reusing EU instructions unchanged.
Official sources and certification enquiries
Requirements above are referenced to ISCC EU 203 v4.2, sections 3.2.1–3.2.3. Check the official document library and ISCC system updates for changes applying to your scheme and role. Sources were reviewed on 24 November 2026. The checklist and example are Get-ISO implementation suggestions, not additional scheme requirements.
Read the related first-audit mass-balance preparation guide for UCO traders. For initial certification, recertification or a change of certification body, contact Get-ISO through the ISCC certification enquiry service. Describe your operation and staffing cover so the certification pathway can be scoped; availability and audit arrangements need confirmation.
General guidance. Use the applicable standard, scheme documents and agreed engagement criteria. Examples are illustrative and do not establish a certification outcome.