ISCC PLUS audit risk when one site has multiple scopes

See how a collecting point and processing unit on one ISCC PLUS audit are classified, which records the auditor samples and how surveillance is assessed.

Illustration of a supervisor checking material records in a recycling plant receiving area.
AI-generated illustration; not an actual client audit.

When a single ISCC PLUS audit covers several scopes, a mandatory high-risk classification in any one scope makes the overall audit high risk. The auditor can tailor verification to the risks of each activity while meeting the applicable minimum verification requirements.

The 25 November 2026 ISCC update applies to audits under the standalone documents from that date and to all PLUS audits from 1 January 2027. During the transition, an audit conducted under the previous document version follows that version. See ISCC PLUS 204 section 3.2.2 and PLUS 201 sections 3.2.1 and 3.2.5.

Example: a collecting point and processing unit share one site

Assume a recycling business has both scopes in one initial audit. The collecting point handles a raw material flagged as high risk in the applicable ISCC material list. The processing unit receives that same raw material entry and receives no other raw material entry or intermediate.

  • Overall audit: the collecting point requires risk factor 2.0, so the combined audit is high risk.
  • Collecting point: the high-risk entry triggers mandatory surveillance following initial certification.
  • Processing unit: one high-risk raw entry alone does not trigger the processing-unit surveillance rule. The certification body evaluates the processing activity against the applicable risk and verification criteria.

If the processor later adds an intermediate, that input configuration meets the processing-unit surveillance trigger at initial certification. For a change after certification, record the effective date and confirm the applicable action with the certification body. Record surveillance decisions separately from the audit risk rating.

How to set up the evidence

Have the certification lead maintain a scope and material register. For each input, record the official material entry, its classification, the activities handling it and the source record supporting that decision. Receiving staff link the supplier declaration and weighbridge ticket to a lot ID. Production staff use that same ID when booking internal transfers and consumption. The certification lead reviews changes to proposed inputs before first receipt and records the certification body’s decisions on scope, audit risk and surveillance.

What the auditor will check

  1. Compare the approved activity map and audit plan with what happens at the site, including shared intake and storage.
  2. Sample a lot from its supplier declaration and receipt through the transfer to processing. Reconcile tonnes received, transferred and held in stock using matched lot references.
  3. Verify the exact material entry and high-risk flag against the applicable list, then check which scope drives the overall factor and how minimum coverage is met for both scopes.
  4. Check the surveillance decision and supporting records for each activity, including actual input combinations. Confirm the applicable timing and on-site arrangements with the certification body.

Mason Ali is BM Certification’s ISCC representative for Australia and New Zealand. Get-ISO coordinates enquiries. The appointed certification body makes the certification decision.

Sources

ISCC System Updates (25 November 2026, section 2.3) and ISCC PLUS system documents and material lists.

General guidance. Use the applicable standard, scheme documents and agreed engagement criteria. Examples are illustrative and do not establish a certification outcome.