ISCC PLUS · System update
ISCC PLUS surveillance audits: when do the new rules apply?
Use the November 2026 ISCC PLUS update to assess audit risk and mandatory surveillance separately. See two processing examples and the records an auditor checks.

An ISCC PLUS processing unit taking both a raw material and an intermediate needs mandatory surveillance after initial certification under the November 2026 update. The certification body still assesses audit risk separately. These are two decisions with different triggers.
Which audit dates does the change cover?
ISCC’s 25 November 2026 bulletin updates ISCC PLUS 204 section 3.2.2 and ISCC PLUS 201 sections 3.2.1 and 3.2.5. The rules apply to audits under the standalone documents from 25 November 2026. Audits under the previous version during transition follow that version. From 1 January 2027, all ISCC PLUS audits use the updated requirements. Record the audit date and document basis together.
Make two decisions for every site
- Audit risk. Collecting Points, Central Offices of Points of Origin and individually certified Points of Origin handling a listed high-risk material must be assessed at high risk (factor 2.0). For other scopes, the certification body determines the risk under PLUS 204, including any other mandatory high-risk criteria. If any scope in a combined audit mandates high classification, the overall audit is high risk. Activity-level verification must still meet applicable minimums.
- Surveillance after initial certification. The origin and collection scopes above require surveillance when handling a listed high-risk material. A Processing Unit requires surveillance if it receives a raw material and an intermediate, or at least two distinct raw material entries with at least one listed as high-risk. Receiving only intermediates, only non-high-risk raw materials, or a single high-risk raw material entry does not trigger this Processing Unit rule. Different sustainability characteristics of the same entry still need separate identification and quantities in the books.
Two examples from a processor’s receiving dock
One high-risk raw entry in two lots. A processor receives 30 tonnes and 20 tonnes under the same official raw material entry, with different sustainability characteristics. The receiving team books the lots and characteristics separately. The certification lead records one distinct raw entry and sends the intake matrix to the certification body to confirm both decisions. On these facts the Processing Unit’s mandatory surveillance trigger is absent.
One raw entry and one intermediate. The processor adds an intermediate from a new supplier. Procurement checks the material entry and the supplier’s records before approval. The certification lead updates the scope-and-input matrix and agrees the surveillance timing and on-site arrangements with the certification body. The combination triggers mandatory surveillance even if the raw material is low risk. Existing rules on timing, on-site verification, certification gaps and the prohibition on substituting early recertification still apply. Zero certified transactions since certificate validity began do not remove a mandatory surveillance obligation.
What the auditor will check
- Confirm the audit date, document version, initial certification status and every scope on the audit plan.
- Sample supplier declarations and receiving records against the current material list. Confirm distinct entries, high-risk flags and raw versus intermediate status. Reconcile lot quantities with inventory and quantity bookkeeping, including separate sustainability characteristics for identical entries.
- Review the certification body’s risk determination independently of the surveillance decision. For a combined scope, check which activity drives the overall classification and how minimum verification is covered.
- Check the surveillance file for the timing basis, planned or completed on-site verification and any certification gaps. Review the transaction ledger when the site reports no certified activity.
Mason Ali is BM Certification’s ISCC representative for Australia and New Zealand. Get-ISO coordinates enquiries. If appointed as the certification body, BM Certification makes the certification decision and issues the certificate.
ISCC references
- ISCC System Update, 25 November 2026, section 2.3. See the ISCC System Updates register.
- ISCC PLUS 201 and 204 and the applicable material list in the ISCC document library.
General guidance. Use the applicable standard, scheme documents and agreed engagement criteria. Examples are illustrative and do not establish a certification outcome.