Discuss your requirements ↗

Home / Resources

Integrated controls · ISCC PLUS add-on claims

ISCC PLUS add-ons: a PDCA test to keep data and claims separate

Use a worked PDCA exercise to separate PLUS add-on trial data, consultation drafts and approved claims before they reach customer dispatch documents.

Illustration of a dispatch supervisor and coordinator reviewing a customer document; headline: Is that claim ready to leave?
AI-generated illustration; not an actual client audit.

When implementing voluntary ISCC PLUS add-ons, keep the status of the method, the status of the data and the approval of the customer claim separate. A trial calculation can be complete without being approved for customer use. A consultation draft can be useful for learning without establishing a current certification claim.

This original Get-ISO practice exercise uses Plan, Do, Check, Act to implement the 25 November 2026 ISCC PLUS update on voluntary add-ons. It does not present the scheme changes as ISO requirements. The scenario, suggested controls and test records are illustrative, not official exam questions, a mandatory operator examination, a qualification or an actual client result.

What changed, who is affected and when?

The bulletin announces the availability of the voluntary ISCC PLUS GHG Add-on 205-01 v1.2, based on the methodologies in ISCC EU 205 and 205-1. It applies to PLUS users under System Document v3.4.2 and the standalone documents. ISCC particularly recommends it for fuel products; that recommendation does not make adoption universal.

The separate Fuel-Use Excluded add-on v1.0 is a consultation draft. The consultation runs from 10 November 2026 to 8 January 2027. It concerns attribution excluding fuel-use quantities, particularly relevant to chemical recycling, and is intended for voluntary markets. It does not follow the Single-Use Plastics Directive Implementing Act methodology.

The availability notice is dated 25 November 2026. It gives no separate future mandatory adoption date for the voluntary GHG add-on. The FuE feedback deadline is not a compulsory implementation date. Neither item automatically changes an operator’s authorised scope or permits an unreviewed claim. This exercise concerns PLUS; using EU calculation methodologies within an add-on does not turn a PLUS claim into an EU or CORSIA certification claim.

Supervisor exercise: one checkbox releases three different statements

A fictional polymer producer is reviewing voluntary PLUS add-ons. Its technical team has a GHG trial worksheet referencing 205-01 v1.2. A separate project folder contains a learning exercise based on the FuE consultation draft. Neither trial has been approved for customer claims. A polymer-site trial is not proof that its product falls within the GHG add-on’s applicable scope; that question remains part of the coordinator’s review.

An ERP administrator creates a single checkbox called “add-on ready”. When selected, it adds a GHG statement, a Fuel-Use Excluded statement and a regulatory-compliance sentence to the customer dispatch document. Sales asks the dispatch supervisor to select it for a twelve-tonne order because the trial workbook is complete.

Your task: What would you release, what would you hold, who must decide and what evidence would you retain? How would you test that the next dispatch cannot inherit an unapproved statement?

This is a document-release example. It does not demonstrate an attribution calculation, prove a twelve-tonne claim or establish eligibility under either add-on.

Plan: define separate decisions before changing the ERP

The certification coordinator owns the applicability review: scheme, document version, site activities, adopted add-on and any necessary certification-body confirmation. The GHG lead owns the calculation method, boundaries, inputs and technical review. The ERP owner implements the approved data and output rules. Sales owns the proposed wording and intended use; a designated competent reviewer authorises customer statements.

Create a decision register linking each proposed statement to its method, supporting records and approval. Record consultation material as a draft reference. Record a trial result as trial data. Keep customer-use approval as a separate decision with a named owner and date. These are suggested internal control fields, not ISCC’s prescribed software design.

In the exercise, “workbook complete” cannot answer all three questions. It does not establish that the method is final, that the calculation is verified for its intended use, or that the wording is permitted for that transaction. Review any actual scope or assurance requirements with the appointed certification body rather than relying on an internal status label.

Do: keep trial data out of the customer-output path

DecisionSuggested control and ownerRetained evidence
Applicable methodCoordinator identifies the relevant PLUS document/version and whether it is available or still a consultation draft.Source reference, applicability assessment and unresolved questions.
Technical dataGHG lead separates trial and reviewed datasets and links results to their actual boundaries and inputs.Worksheet version, source records, assumptions and review outcome.
Permitted wordingClaim reviewer approves specific wording and intended use independently of the data-entry status.Wording revision, evidence basis, scope check and approval.
Transaction outputERP owner enables only the approved statement for the relevant transaction context.Configuration revision, test order, generated output and release record.
Draft learning workProject owner stores it as learning material outside the live claim-output path.Draft reference, learning purpose and access/output restrictions.

The supervisor pauses the proposed add-on statements and routes the three questions to their owners. The underlying order is assessed separately under its existing applicable controls. Holding an unsupported new statement does not itself establish that the physical goods or all existing claims must be stopped.

The ERP owner removes the single checkbox’s ability to release unrelated statements. The team retains the trial records for technical review. It does not convert the FuE learning exercise into an approved certificate claim by renaming its folder. The proposed regulatory sentence also needs its own valid basis; the draft FuE approach cannot demonstrate compliance with the SUPD Implementing Act methodology.

Check: read what the customer would actually receive

Use a clearly labelled test order and inspect the generated dispatch document, any declaration attachment and the customer-facing export. A correct screen label is insufficient if an old output template still inserts the claim. Keep copies of the test inputs and outputs without issuing them to a real customer.

Run three practical tests. First, leave trial data present but customer-use approval absent: the new statement should not appear. Second, attach the FuE draft-learning reference: it should not create a current certification or regulatory claim. Third, use a statement that has actually completed the applicable review: only its approved wording should appear in its approved context. That third test is conditional; inventing an approval merely to make the test pass defeats the control.

The twelve-tonne order must remain one order across these tests. Do not create another stock receipt or add quantity because a trial add-on project exists. Reconcile order identity, quantity and linked evidence before and after the configuration change. This checks data integrity; it is not a demonstration that twelve tonnes of any particular characteristic are available for allocation.

An auditor can sample an issued customer document and trace its wording back to the claim approval, method/version, scope review and supporting data. A reverse sample can start at a trial worksheet or consultation draft and check that it has not appeared as an approved statement on a live transaction. Reconcile the selected transaction’s identity and quantity with the source records and inspect the configuration change trail.

Act: correct the release rule and test its next use

If the test produces an unapproved statement, the ERP owner corrects the rule or template and repeats the failed test. The coordinator determines whether any actual prior outputs were affected, with the responsible parties and certification body where relevant. Retain original records, corrections and communications rather than silently overwriting issued documents.

After a successful retest, check the next relevant live transaction. Ask the dispatch supervisor to explain which statement is approved and retrieve the supporting decision from normal records. Record whether the generated output matches that decision. A completed training attendance sheet or a new checkbox alone does not prove the failure path is closed.

When a consultation document is later finalised, the coordinator should review the final text and announced application arrangements as a new controlled change. Do not automatically promote the draft project into live use on the consultation closing date.

Quality, environmental and worker considerations

The quality concern is whether the right information reaches the right customer with authorised wording and a retrievable evidence trail. The environmental concern is whether the GHG or attribution statement is substantiated for its actual boundary, method and intended use. Keeping two files apart does not validate either calculation.

The worker concern is whether dispatch staff understand the revised release decision and can raise an uncertainty without pressure to select a misleading status. Consult the staff who prepare and check documents. If evidence collection requires entering operational areas, retain the site’s safe-access and work controls; this exercise does not require a new physical task or changed plant operation.

These are integrated management-system considerations. ISO’s catalogue identifies ISO 9001:2026 and ISO 14001:2026 as published, alongside current ISO 45001:2018 and its 2024 amendment. This exercise applies PDCA to the specified ISCC update; it does not attribute the add-ons, draft method or approval fields to new ISO requirements.

Link the decision to the right certification enquiry

Our PLUS intake and ERP change-control exercise addresses a different mapping decision. The same discipline applies: an internal name or status needs an evidenced meaning before it drives an external statement.

Use the ISCC certification service or certification enquiry form to discuss initial certification, recertification or a change of certification body. Include materials, sites, activities, intended fuel/product and market, current scheme/body, certificate expiry and target audit date as applicable. Identify the proposed add-on, document version, current data-review status and intended claim.

Get-ISO handles enquiries and coordinates the pathway. Mason Ali is BM Certification’s ISCC representative for Australia and New Zealand. BM Certification makes certification decisions and issues certificates where appointed as the certification body. An internal exercise or gap review does not grant certification.

Sources and status checked on 29 November 2026

  • Original ISCC bulletin dated 25 November 2026, sections 2.1–2.2, checked against the official System Updates register.
  • ISCC public consultation page, for the FuE draft status, consultation dates and regulatory-method distinction. Stakeholder comments on that page are not treated as scheme requirements.
  • ISCC document library, for applicable controlled documents. This exercise does not reproduce the add-on methodology or private assessment material.
  • ASQ’s PDCA explanation, for the improvement method. The workflow and test cases above are independently developed.
  • Official ISO catalogue records linked above, checked through current catalogue search records after direct retrieval returned an access restriction. Draft ISO documents are not used as audit criteria.

General guidance. Use the applicable standard, scheme documents and agreed engagement criteria. Examples are illustrative and do not establish a certification outcome.

All resources · Related service

Call Mason