If you are seeking ISCC PLUS certification for a processing unit, establish your actual input configuration before budgeting the audit programme. Mandatory surveillance after initial certification depends on the types and distinct entries received. A low audit-risk assessment does not cancel a surveillance trigger, and a high-risk input alone does not settle both questions.

This guide applies the 25 November 2026 ISCC System Update through a processing decision table and two original quantity-reconciliation exercises. It supplements our overview of the new PLUS surveillance rules with the records needed to substantiate the decision. The fictional identifiers and quantities below are illustrative Get-ISO practice, not official material names, assessment questions or client results.

Mason Ali is BM Certification’s ISCC representative for Australia and New Zealand. Get-ISO handles enquiries and coordinates the certification pathway. BM Certification makes certification decisions and issues certificates where appointed as the certification body.

Which scheme and audit dates does this cover?

The update concerns PLUS 204 section 3.2.2 and PLUS 201 sections 3.2.1 and 3.2.5. It applies from 25 November 2026 to standalone-document audits; previous-version audits during transition follow that version. From 1 January 2027, all PLUS audits use the updated requirements and applicable standalone documents. Audit date determines applicability.

This is PLUS guidance. HEFA SAF, HVO and FAME describe fuel pathways, not interchangeable certification schemes. A UCO business pursuing EU-market fuel or CORSIA aviation claims must establish its applicable scheme separately; this PLUS processing rule does not replace EU or CORSIA criteria.

Processing-unit decision table

For the processing rule, raw material plus intermediate triggers surveillance; so do at least two distinct raw entries including a high-risk entry. Different sustainability characteristics of one entry are not separate inputs, but their characteristics and quantities must remain identifiable.

Intake configurationProcessing surveillance trigger?Evidence to resolve
One high-risk raw entry, several lots or characteristic setsNo, on these facts aloneSame official entry; separate lot characteristics and quantities
Two distinct raw entries, at least one high riskYesDistinct entries and applicable high-risk designation
Raw material plus intermediateYesSupported classification of each input
Only intermediatesNo under this ruleEvidence that no raw input is hidden by a commercial label
Only non-high-risk raw materialsNo under this ruleCurrent entry and risk-status evidence for each raw material

Audit risk is assessed separately. Listed high-risk materials mandate factor 2.0 at collecting points, central offices of points of origin and individually certified points of origin. Other scopes need certification-body assessment, including other mandatory criteria. A mandatory high-risk scope makes a multi-scope audit high overall; minimum verification still covers every activity.

Case 1: two distinct raw entries and an unexplained three tonnes

A fictional PLUS processing unit preparing for initial certification receives two distinct raw material entries. In its controlled evidence pack, RAW-A is identified as high risk and RAW-B is not. These labels stand for verified official entries, not invented additions to an ISCC list. The updated rules apply to the audit.

The certification coordinator records that the two-entry configuration triggers post-initial surveillance. The appointed certification body assesses audit risk separately and establishes the applicable surveillance arrangements. The production supervisor and stock controller then prepare this illustrative input-stock reconciliation, in tonnes:

Input entryOpeningReceiptsIssued to processExpected closingRecorded closing
RAW-A040251515
RAW-B0151058

The auditor samples the entry mapping and risk evidence, then traces receipts to supplier documents and receipt measurements and issues to production records. RAW-B does not reconcile: 0 + 15 − 10 gives 5, not 8. A correct surveillance decision cannot resolve the quantity discrepancy.

The stock controller investigates source records before amending the ledger. If, for example, a duplicate receipt caused the difference, retain the duplicate reference, correction approval and before/after balances. If the cause is not established, record the unresolved difference and assess affected claims and dispatches with the certification coordinator. Do not insert an unexplained balancing entry.

This is an input-stock check, not a complete process mass balance. Output quantities, conversion, losses, applicable sustainability allocations and the relevant scheme bookkeeping still require their own supporting records. Reconcile each characteristic set within each entry; the two-entry total alone is insufficient.

Case 2: “only intermediates” is contradicted by the receiving file

A second fictional processor has classified its intake as only intermediates and recorded no processing-rule surveillance trigger. The auditor selects a receipt from the receiving register rather than relying exclusively on that summary. The linked technical description and upstream evidence identify it as a raw material; a different, supported intermediate is also received.

The technical manager checks the classification against the applicable official material information and supplier evidence. The certification coordinator corrects the intake matrix and refers the raw-plus-intermediate configuration to the appointed certification body. That configuration triggers surveillance under the updated processing rule. A commercial description such as “pre-treated” does not establish intermediate status on its own.

The coordinator keeps the original decision, corrected classification, affected receipts and certification-body response together. Purchasing corrects the supplier approval information; receiving staff use the revised instruction. The internal reviewer traces another receipt backwards from the ledger and checks the next intake to confirm that the same misclassification is not recurring.

Checklist: what to have ready for the auditor

  1. Applicability: certification coordinator retains the audit date, initial-certification status, scopes, document versions and linked November update.
  2. Input identity: technical manager retains official material entries, raw/intermediate classification evidence and high-risk status. Auditor compares these with actual supplier and receiving records.
  3. Quantities: stock controller retains receipts, issues, stock measurements, characteristic-level bookkeeping and approved corrections. Auditor reconciles movements forwards and backwards, rather than checking a total in isolation.
  4. Separate decisions: coordinator retains the certification body’s risk assessment and surveillance determination. For combined scopes, see our multi-scope audit-risk example.
  5. Execution: coordinator retains the surveillance timing basis, booking or completed report, on-site arrangements and any gap review. A booking is evidence of planning, not evidence that the audit occurred.

Existing timing, on-site, no-early-recertification-substitution and certification-gap rules remain. No certified transactions since certificate validity began does not remove mandatory surveillance. Confirm the applicable arrangements with the certification body; this guide does not invent a universal booking deadline or audit duration.

Discuss initial certification or recertification

The current ISCC directory lists BM Certification SIA for ISCC PLUS, ISCC EU, ISCC CORSIA and ISCC CORSIA PLUS. Directory recognition does not determine the appropriate scheme or approved scope for your particular site.

Contact Get-ISO through the ISCC certification service or initial certification, recertification or change-of-body enquiry form. Include feedstocks and official entries, sites, activities, intended product or fuel and market, current scheme/body, certificate expiry and target audit date. For a processing unit, identify raw materials and intermediates separately. That information supports a meaningful scope discussion without promising eligibility, audit timing or certification.

Official sources checked on 27 November 2026

General guidance. Use the applicable standard, scheme documents and agreed engagement criteria. Examples are illustrative and do not establish a certification outcome.

All resources · Related service

Call Mason